dc.contributor Graduate Program in Industrial Engineering.
dc.contributor.advisor Ulusoy, Gündüz.
dc.contributor.author Özdamar, Linet.
dc.date.accessioned 2023-03-16T10:30:31Z
dc.date.available 2023-03-16T10:30:31Z
dc.date.issued 1988.
dc.identifier.other IE 1988 Oz2
dc.identifier.uri http://digitalarchive.boun.edu.tr/handle/123456789/13471
dc.description.abstract The problem considered in this study is that of scheduling the activities of a project network to minimize project duration under limited resource requirements and availabilities. Various heuristic rules and optimization techniques have been applied to this problem and comparisons of their effectiveness with respect to one another have been made in the literature. However, a thorough investigation of the types of network and resource characteristics which play an underlying role in detenmining heuristic performance and which account for the variability of results has not been performed previously. The aim of this study is to specify the relationships between individual problem characteristics and heuristic perfonmance, as well as developing a new heuristic rule which will be compared with widely-used rules.
dc.format.extent 30 cm.
dc.publisher Thesis (M.S.)- Bogazici University. Institute for Graduate Studies in Science and Engineering, 1988.
dc.relation Includes appendices.
dc.relation Includes appendices.
dc.subject.lcsh Heuristic programming.
dc.title A heuristic approach to resource allocation
dc.format.pages x, 200 leaves;